About the client
The client is a global health technology company, active worldwide across a broad portfolio of health and wellbeing solutions. As part of its ongoing digital transformation, the company has been implementing o9 as its advanced planning system (APS) across its businesses, aiming to strengthen how demand and supply planning decisions are made and translated into execution.
The challenge
During the design and implementation of o9, the company uncovered a blind spot common to many APS rollouts: while the new system connected demand planning to supply planning, it didn’t connect supply planning to scheduling and operational execution. Tactical decisions were being made in o9, but the detail required to execute them still lived in SAP, with no clear logic bridging the two.
Closing that gap meant answering questions like:
- How do you translate production routings and bill-of-material data, held at execution level in the ERP system, into the aggregation level that supply planning actually needs?
- How do you identify and plan critical components over a mid- to long-term horizon, without burying the plan in detail that will change anyway?
- How do you translate strategic decisions on capacity levelling and stock building at buffer points into operational plans for the coming six to sixteen weeks?
The root cause was a familiar one. APS implementations are typically centered around the tactical planning horizon, with integration treated as a technical data-mapping exercise late in the project. The underlying business logic (which decision belongs in which horizon, at what level of detail, and who owns it) is often not made explicit. The result is predictable: planners keep working outside of their planning system because the integration with operational processes is not solid enough.
The project
EyeOn worked with the client through a structured series of workshops, following EyeOn’s standard APS design approach and bringing together the client’s subject matter experts with EyeOn’s supply chain specialists. Each workshop had a clear objective, required solid preparation from the business, and closed with a signed-off deliverable:
- Decision mapping: making explicit, per planning horizon, which decisions are taken, by whom, and at what level of detail.
- Process design: designing the short-, mid-, and long-term planning process around those decisions, including the handovers between them.
- Data and integration design: translating the process into user stories and data mappings between o9 and SAP ECC.
- Validation and sign-off: reviewing the design with supply chain leadership and confirming it before implementation.
The full sequence of activities was executed in ten weeks, from the first workshop to a signed-off design. That pace was deliberate: a short, intensive series keeps senior stakeholders engaged and keeps the design ahead of the implementation, rather than trailing behind it.
Because the design was built together with the people who work with it day-to-day, two common risks were avoided: the design didn’t become a consultant’s document nobody recognized, and the client’s organization was taken along early in the change rather than confronted with it at go-live. The workshops delivered a decision matrix per planning horizon, an integrated process design, and documented integration gaps to close for the o9 go-live.
Results
In ten weeks, the integration design became the foundation for the o9 implementation across the company’s businesses. It enabled a clear view of the end picture at every stage, instead of integration gaps only surfacing once the system was already live. The project produced a clear specification of the integration functionality and process design needed to turn the tactical plan into a shopfloor schedule, a requirement that would otherwise have surfaced far later, and at far higher cost.
EyeOn’s take
This client’s experience reflects a gap many organizations only discover after go-live: a planning system that connects demand and supply planning but falls short for the translation and handover to operations. By making planning decisions and their ownership explicit horizon by horizon, before finalizing the technical integration, the company was able to design the bridge to execution as part of the implementation, not as an afterthought.
If your organization is planning to implement or redesign an advanced planning system, EyeOn can help you bridge the integration gap to the shopfloor before go-live, not after it. Want to know more about our end-to-end APS digital transformation framework? Our transformation guide gives you a roadmap based on proven strategies used by industry leaders. Download your copy here or get in touch with our transformation specialist right away.